We design and build second homes around Geneva Lake, and we work between October and May so the summer you bought the house for stays yours.

Build windows
Design in summer, build in the off-season
Most owners are at the lake from Memorial Day to Labor Day. We use those months for design visits and leave the house alone, then build while you're away.
Design visits and decisions
You're at the house, so we walk the lot with you, see the light on the water and settle the plan, the finishes and the order of rooms.
Jun-Sep
Permits and long orders
Town and county permits, shoreland review near the water, and the windows, cabinetry and stone that set the schedule.
Aug-Nov
Structure and shell
Foundations, framing, roof and windows, closed in before deep winter.
Oct-Jan
Interiors
Heated and dry: mechanicals, plaster, millwork, tile, cabinets and finish.
Dec-Apr
Porches, decks and grounds
Exterior finishes and outdoor rooms once the ground thaws, done before the first weekend of the season.
Apr-May
June to September: no builds, only design visits. Dates move with the winter and with your house; this is the order of work, not a promised start.
Projects
Cottages, porches and kitchens
Sample work from houses on small lakes and big ones.
Sample photos.
Who builds your house
A designer who also holds the contractor's credential
Aitana Beltran draws your house and her crew builds it, so a question on a Tuesday in January goes to the person who made the drawing. Between us we cover design, site supervision, carpentry and the schedule.
One person answers for the drawings and the work
A site superintendent in the house every working day
Photos to you every week while you're away
Aitana Beltran
Owner and lead designer

What we build
Six kinds of work for a house that sits empty in winter
Each one is drawn and priced before it is built.
Whole-house renovations
A cottage rebuilt on its own frame or gutted and re-planned, designed in summer and built in one off-season.
MoreAdditions and second stories
A wing for the family weekends, or a second floor for the view of the water.
MoreKitchens and baths
A kitchen that feeds the whole house on a holiday weekend, and baths worth the drive up.
MoreScreened porches and decks
The room the house is really about: screened, glazed or open, framed to face the lake.
MoreGuest houses and carriage houses
A second building on the lot, from a studio over the garage to a small guest cottage.
More
Why the off-season
Build in the off-season or in the summer
Both can be done. This is how they differ at a lake house.
| June to September | October to May | |
|---|---|---|
| Your summer | June to SeptemberTrucks, saws and a dumpster at your own dock. | October to MayBetter: Untouched. The house is yours and the lot is quiet. |
| Trades | June to SeptemberEvery lake house is hiring the same trades at the same time. | October to MayBetter: Local trades are freer once the boating season ends, so the same crew can stay start to finish. |
| Weather | June to SeptemberBetter: Long days and dry ground, and storms and heat. | October to MayShort days and frost. We close the house in first and heat it for the finishes. |
| Lake roads | June to SeptemberNarrow roads busy with summer traffic. | October to MayBetter: Quiet lanes and few visitors. |
| Seeing the work | June to SeptemberBetter: You see it every day you're there. | October to MayYou come up for a weekend and walk it; we send photos between. |
How it works
From first call to the first night back
- 01
Step 1: A call, then a walk on the lot
We come to the house, look at the shoreline and the frame, and tell you which build window it fits.
- 02
Step 2: Drawings over the summer
We design with you while you're at the lake, with a scope and a written estimate to follow.
- 03
Step 3: A calendar you can read
The estimate lists scope, allowances and weeks, and the calendar says when the house is closed in.
- 04
Step 4: Building while you're away
A weekly photo update, a locked site and a walk-through on your weekends.
- 05
Step 5: Back at the lake
A final walk, a short punch list and a clean house before the season opens.
Owners
Notes from lake house owners
“The cottage had never been warm in January. Aitana explained what had to happen in what order, and the heat came on the same month the roof closed in.”
“I liked the calendar. It said which months were for building and which were for swimming, and it matched what happened.”
Sample reviews.
Where we build
Geneva Lake and the lakes around it
The house has to be in southeast Wisconsin. Where you live the rest of the year doesn't matter.
Walworth County
- Lake Geneva
- Williams Bay
- Fontana-on-Geneva Lake
- Walworth
- Sharon
- Delavan
- Darien
- Elkhorn
- Genoa City
- East Troy
Kenosha County
- Twin Lakes
- Paddock Lake
Racine County
- Rochester
- Wind Lake
We don't build in Illinois, on the Lake Michigan shore or north of Waukesha. If your house is in one of the towns above, we'll come to it.
Questions
What second-home owners ask first
Why only October to May?
Because the house is lived in from Memorial Day to Labor Day, and a lake road in July is a poor place for a loaded truck. We keep those months for design visits so your summer is yours.
Can you start a project in the summer?
Design, yes. We use the summer for walks, drawings and permits. A build is a different matter; if something is already under way, we'll tell you plainly what can and can't be done while you're in residence.
How early should I ask for a build window?
While you're at the lake. Design takes the summer and windows and cabinetry take months to arrive, so the first conversation is the earliest part of the schedule. We say so when a window is full.
Is there a design fee?
Yes. Design is paid work with a defined scope, and the build estimate is written from the finished drawings. How the numbers are built is on the pricing page.
Who is in the house while we're away?
Our carpenters and trades we've named to you in advance. The site is locked, the superintendent is there every working day and you get photos every week.
My house was built before 1978. Does that change how you work?
Yes. For homes built before 1978, federal rules require a renovation firm to be EPA lead-safe certified and to use lead-safe work methods wherever paint would be disturbed. Our certificate is on the credentials page. Minor repairs under 6 square feet inside or 20 square feet outside are exempt, but window replacement and demolition are always covered.
Ask for a build window
Tell us about the house
We write back with a time to walk the property and the build windows that could fit.
- Monday – FridayToday
- 8 a.m. – 4:30 p.m.
- SaturdayToday
- By appointment
- SundayToday
- Closed
Lake season, June to September: design visits only. We build October to May.