Monday – Friday: 8 a.m. – 4:30 p.m. · Saturday: By appointment · Sunday: Closed · Lake season, June to September: design visits only. We build October to May.Monday – Friday: 8 a.m. – 4:30 p.m.Woman ownedDwelling Contractor Qualifier · WI Cert. # 000000Lead-Safe Certified Firm (RRP) · US Cert. # 000000General liability and workers' compensation
2 more licenses
  • Dwelling Contractor Qualifier · WI Cert. # 000000
  • Lead-Safe Certified Firm (RRP) · US Cert. # 000000
  • General liability and workers' compensation
(262) 555-0102

Renovation

Whole-house renovations

A lake cottage rebuilt on its own frame, or gutted and re-planned, designed over a summer and built in one off-season.

Most lake houses were built for July and have been patched since. We look at what the frame, the roof and the mechanicals can still do, then draw a house that works from Memorial Day to the first snow, and in a January weekend too.

What's included

  • A survey of the existing frame and mechanicals

  • Drawings and a written scope

  • Structural repairs and new framing

  • Electrical, plumbing and heating

  • Insulation and air sealing

  • Windows, stairs, millwork and finishes

A bright living room with a fireplace, tall windows and dark wood floors lit by low sun

Cost

What changes the cost

No figure here: the house sets the number, and the estimate shows where it came from.

  • The frame

    What is behind the plaster decides how much is repair and how much is new.

  • How far the plan moves

    Moving a stair or a bathroom costs more than refinishing it where it is.

  • Windows and millwork

    Stock sizes and profiles cost less than matching an old cottage's custom ones.

  • Heating

    A house that was only used in summer often needs a new system.

  • Permits and the water

    Near the shore, shoreland rules can limit where and how much we build.

How it goes

A renovation across one off-season

  1. 01
    June to September

    Step 1: Survey and drawings

    We measure the house, open a few walls and draw the plan with you at the lake.

  2. 02
    August to November

    Step 2: Permits and orders

    We apply for what the town and county require and order the windows and cabinets.

  3. 03
    October to January

    Step 3: Shell and mechanicals

    Structure, roof, windows, then wiring, plumbing and heat.

  4. 04
    December to April

    Step 4: Interiors

    Plaster, millwork, tile, cabinets and paint in a warm, dry house.

  5. 05
    April to May

    Step 5: Walk-through

    A final walk and a short punch list before the season opens.

Questions

About renovating a lake house

Do we have to be away while you build?

Not for the whole time, but a whole-house renovation is rarely livable. That is one reason the off-season works: most owners aren't there.

Who applies for the permits?

We do, and the estimate lists the permits it expects. Towns and counties differ, so we ask yours what applies.

What if you find a problem behind a wall?

We photograph it, tell you what it is and price the fix in writing before we do it.

Build windows

Ask for a build window

Tell us about the house and when you're there, and we'll say which window it fits.