Monday – Friday: 8 a.m. – 4:30 p.m. · Saturday: By appointment · Sunday: Closed · Lake season, June to September: design visits only. We build October to May.Monday – Friday: 8 a.m. – 4:30 p.m.Woman ownedDwelling Contractor Qualifier · WI Cert. # 000000Lead-Safe Certified Firm (RRP) · US Cert. # 000000General liability and workers' compensation
2 more licenses
  • Dwelling Contractor Qualifier · WI Cert. # 000000
  • Lead-Safe Certified Firm (RRP) · US Cert. # 000000
  • General liability and workers' compensation
(262) 555-0102

Additions

Additions and second stories

A wing for the family weekends, or a second floor for the view of the water.

An addition has to look as though the cottage always had it. We draw rooflines, windows and trim to match, and plan the foundation and framing for the months when the ground allows it.

What's included

  • Survey and drawings

  • Foundation, framing and roof tie-in

  • Windows and siding matched to the house

  • Heating and cooling for the new rooms

  • Interior finishes

  • Permit applications

Exposed wood roof framing with trees visible through the open walls of an addition

Cost

What changes the cost

No figure here: the house sets the number, and the estimate shows where it came from.

  • Foundation and soil

    A crawl space, a slab or a full foundation each cost differently, and the soil decides which is practical.

  • How much of the roof changes

    A second story means opening the roof, which changes everything below it.

  • Matching the house

    Windows, siding and trim that match the old ones cost more than plain new ones.

  • Heating and cooling

    The existing system may not carry the new rooms.

  • Shoreland limits

    Close to the water, rules on setbacks and covered area can change what you may add.

How it goes

An addition, season by season

  1. 01
    June to September

    Step 1: Drawings over the summer

    We draw it with you while you're at the lake.

  2. 02
    August to November

    Step 2: Permits and orders

    Applications go in; windows and framing packages are ordered.

  3. 03
    October to January

    Step 3: Foundation and frame

    Footings, framing and roof while the ground can be worked.

  4. 04
    December to April

    Step 4: Closed in, then finished

    Mechanicals, insulation and interiors in a heated shell.

Questions

About adding to a lake house

Will the addition match the old house?

That is the point of drawing it first. We show you the rooflines and window sizes on paper before anything is ordered.

Can you build on a frozen site?

Foundations are poured and framing goes up in winter with the right protection and the right schedule; we plan it in the drawings, not in the field.

Do I need a permit?

Yes. We prepare and submit the applications, and the estimate lists them.

Build windows

Ask for a build window

Tell us about the house and when you're there, and we'll say which window it fits.